At the Kemi Mine, a recent expansion into the Surmaoja orebody required an increase in ventilation capacity. A new ventilation shaft was built with two main fans. The installation is near the entrance gate and only 1.7 kilometres from the nearest permanent dwelling. The main fans were first taken into use as exhaust fans in October 2014. Shortly after the fan installation, comments concerning fan noise were received from the neighbours. The first noise measurements were taken at the main fan installation site by Outokumpu personnel in March 2015. Due to higher than expected recorded values, during late June, 2015, a two-week environmental noise study was planned by the engineers and executed by a consultant specialized in noise measurement. The measurement results were analysed and compared to the requirements of the environmental permit and Outokumpu's factory standards. While the measured values at the nearest dwelling were within the environmental permit limits, high noise values were recorded at the fan station. A second two-week study will be performed after construction of the main-fan heating station has been completed. Actions taken will depend on the outcome.
展开▼