首页> 外文会议>SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition >First Successful Installation of a 4-1/2 Pre-Perforated Liner through a 5-1/2 Solid Expandable Liner
【24h】

First Successful Installation of a 4-1/2 Pre-Perforated Liner through a 5-1/2 Solid Expandable Liner

机译:首先通过5-1 / 2固体可扩展衬里安装4-1 / 2预穿孔衬里的安装

获取原文

摘要

Sustaining field proven technologies in mature fields and maximizing Return of Investment (ROI) is a priority for operators worldwide. Financial constraints such as oil and gas prices, drilling cost, and any intangibles must not burden the success of pushing limits to open new horizons, not just for the present time but also for future generations. Parallel to reaching new limits, we must keep an eye on the safety and engineering behind any step taken toward the limit to push the envelope successfully. Drilling team recently used a a vendor product to maximize production, isolate a loss circulation zone, and push the operating envelop by installing the first 4-1/2" open hole completion (Pre-perforated liner) with inflatable open hole isolation packers through a 5-1/2" X 7" open hole liner (OHL). The vendor product enabled Saudi Aramco to install 5-1/2" X 7" solid expandable liner installation. The 5-Vi" 18.24 lb/ft solid expandable systems was utilized to isolate a loss zone and reactive shale section, sealing off the problematic interval and allowing an extended lateral section to be drilled through the reservoir. The expandable liner was run through a window cut through 7" 26 lb/ft casing and subsequently installed across part of the curve section to isolate the lost circulation zone. The use of the expandable liner enables the ability to drill the remaining build section and horizontal section together with full circulation. This paper describes the challenge and application.
机译:在成熟领域的维持领域已验证技术和最大化投资回报(ROI)是全球运营商的优先事项。石油和天然气价格等财政限制,钻井成本和任何无形资产不能负担推动限制以开放新的视野的成功,而不仅仅是目前的时间,而且还为后代而负担。平行于达到新限制,我们必须遵守对朝向极限采取的一步的安全和工程,以便成功推动信封。钻孔团队最近使用AA供应商产品来最大限度地提高生产,隔离损失循环区,并通过安装前4-1 / 2“开孔完成(预穿孔衬垫),通过一个充气开孔分离封装器推动操作包围通过5 -1/2“x 7”开孔衬垫(OHL)。供应商产品使SAUDI ARAMCO能够安装5-1 / 2“x 7”可稳固的可扩展衬垫安装。5-VI“18.24 LB / FT固体可扩展系统是用于隔离损耗区域和反应性页面部分,密封问题间隔并允许通过储存器钻出延伸的横向部分。可扩展的衬垫通过切割7“26 LB / FT套管的窗户,随后安装在曲线部分的一部分中,以隔离丢失的循环区。使用可扩展衬里的使用使得能够钻取剩余的构建部分和水平钻取能力部分与全循环一起。本文介绍了挑战和应用。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号