Spoil Management at AlpTransit Ceneri Base Tunnel

机译:Alptransit Ceneri基隧道的弃货运管理

获取原文

摘要

More than 800 million tons of material will be excavated during large underground projects such as tunnels, undergrounds and power plants by 2030 in Europe only. The raw material excavated is often classified as waste, which involves environmental impact and transport issues: landfill areas, C02 emissions and noise. But how can such massive amounts of material be transported, processed and deposited?Using the example of the AlpTransit Ceneri Base Tunnel (15.4 km), we show that suitable excavated materials can be used sustainably as a primary resource for tunnel concrete. This requires careful planning of the installations and storage areas by the client, timely building of the processing plants and other handling facilities outside the tunnel and a continuous evaluation of the raw material quality.
机译:在欧洲2030年,在大型地下项目(如隧道,地下和发电厂)等大型地下项目中,将挖掘超过8亿吨材料。挖掘的原料通常被归类为废物,这涉及环境影响和运输问题:垃圾填埋场,C02排放和噪音。但是如何运输,加工和沉积这种大量的材料?使用Alptransit Ceneri基隧道(15.4 km)的例子,我们表明合适的挖掘材料可以作为隧道混凝土的主要资源使用。这需要仔细规划客户和存储区域的客户,并及时建造隧道外的加工厂和其他处理设施,以及对原材料质量的连续评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号