首页> 外文会议>International conference on the design, construction, maintenance, monitoring and control of urban water systems >Field evaluation of hydrological performance of a bioretention basin in an urban tropical catchment
【24h】

Field evaluation of hydrological performance of a bioretention basin in an urban tropical catchment

机译:城市热带集水区生物盆栽水文性能的现场评价

获取原文

摘要

Bioretention basins or rain gardens are constructed green infrastructure in developed areas that retain and treat stormwater runoff. This study evaluates whether a tropical basin in Singapore that is built according to design guidelines from temperate countries has sufficient storage and infiltration capacity to handle tropical storms. Flow measurements from 80 storm events which varied in rainfall depth (2.6-71.8 mm), event duration (10 min-2.8 hr), and antecedent dry period (ADP) (0.25-9.08 days) were recorded for half a year. Hydrological performance in terms of surface and subsurface storage for each storm event has been analyzed. Results show that the basin storage capacity is inadequate since in about 50% of the events, more than 50% of the runoff overflows the basin without soil treatment. In a storm event, the subsurface storage space remains fully saturated throughout the ponding period and the infiltration rate estimated based on the aggregate statistics of 59 events with extended surface infiltration is 1.7 cm/hr. This is within the same order of magnitude as that found by direct field measurement using a double-ring infiltrometer (4.4 cm/hr) but is lower than a recommended rate of > 10 cm/hr. The information drawn from this study could be of use to stormwater managers for sustainable planning and development. For instance, this study suggests that in order to meet pollutant removal rate targets, a tropical basin should be sized to retain a critical water quality volume (WQV) in the range of 10 to 30 mm.
机译:Bioretentent Basins或Darow Gardens在发达的地区建造了绿色基础设施,保留和治疗雨水径流。本研究评估了根据温带国家设计指南建造的新加坡的热带盆地是否具有足够的储存和渗透能力来处理热带风暴。从降雨量深度(2.6-71.8mm),事件持续时间(10 min-2.8小时)和前一年(ADP)(0.25-9.08天)中变化的80个风暴事件的流量测量记录了半年。分析了对每个风暴事件的表面和地下存储方面的水文性能。结果表明,盆地储存能力不足,以来在大约50%的事件中,超过50%的径流溢出了盆地而没有土壤处理。在风暴事件中,地下存储空间在整个池塘期间保持完全饱和,并且基于59个具有扩展表面渗透的59个事件的总统计估计的渗透率为1.7cm / hr。这在使用双环渗透率(4.4cm / hr)的直接现场测量而不是相同的数量级,但低于推荐速率> 10cm / hr。从本研究中汲取的信息可以用于雨水经理,用于可持续的规划和发展。例如,本研究表明,为了满足污染物去除率目标,应尺寸为热带盆地,以保留10至30毫米的临界水质量(WQV)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号