首页> 外文会议>IET/IAM Asset Management Conference >Delivering a Light Rail System into Service – Considerations for Effective Asset Management
【24h】

Delivering a Light Rail System into Service – Considerations for Effective Asset Management

机译:将轻轨系统提供服务 - 有效资产管理的考虑因素

获取原文

摘要

Using experience gained from a number of rail and transit projects the authors discuss how the engineering practices used throughout the lifecycle of a large, modern infrastructure programme affect the delivery and transfer into service of infrastructure assets and describe one particular, pragmatic approach which has enabled Transport for Greater Manchester (TfGM) to successfully introduce a number of new services on what is now the UK's largest tram network.
机译:使用来自多个铁路和过境项目获得的经验,作者讨论了在大型现代基础设施方案的整个生命周期中使用的工程实践如何影响到基础设施资产的交付和转移,并描述了一种特定的,务实的方法,该方法已经支持了运输 对于更大的曼彻斯特(TFGM)成功推出了许多关于英国最大的电车网络的新服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号