首页> 外文会议>IABSE Conference on Structural Engineering >Monitoring of a Large Railway Arch Bridge
【24h】

Monitoring of a Large Railway Arch Bridge

机译:监测大型铁路拱桥

获取原文

摘要

During the partially reconstruction of the Pyhrn railroad line from the Austrian Federal Railways between Linz and Selzthal instead of the old Steyrtalbridge from 1905 a new arch bridge over an storage reservoir was built in 2014. The new bridge is built in reinforced concrete with a length of about 180m. The design of the structure was determined by the rail-track-interaction as it was essential to avoid using rail expansion joints as expensive and maintenance-intensive components. For this reason, extensive measurements should provide information on the structural behavior and are compared with the assumptions and results of the structural analysis. In addition to measurements during an initial loading test the structural behaviour over the seasonal cycle should be determined by measurements. The installed monitoring system stores data since November 2014.
机译:在从1905年的奥地利联邦铁路之间部分重建奥地利联邦铁路的Pyhrn铁路,而不是1905年的旧斯托塔尔布里奇,在2014年建造了一个新的拱桥。新桥内置于钢筋混凝土,长度大约180米。该结构的设计由轨道轨道相互作用确定,因为避免使用轨道膨胀接头作为昂贵和维护密集的部件。因此,广泛的测量应提供有关结构行为的信息,并与结构分析的假设和结果进行比较。除了在初始装载测试期间测量,应通过测量确定季节性周期上的结构行为。安装的监控系统自2014年11月以来存储数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号