首页> 外文会议>Sino-Africa international symposium on textiles and apparel >Quality Management by the Owner in Hydropower Project
【24h】

Quality Management by the Owner in Hydropower Project

机译:水电项目主人的质量管理

获取原文

摘要

The large hydropower stations belong to the major infrastructure of the country.In the course of development and construction management,the series of management system has been widely implemented including the owner's responsibility system,the bidding system,the construction supervision system and the project contract management system.In this situation,the owner faces a new topic on the quality management of the whole project,which will be discussed in this article.Before the project begins to construct,the owner should do a good job about quality management plan including to determine the quality of management objectives,to develop quality policy,to establish quality management agencies,etc.After the project begins,the contents of the quality plan should be implemented well.The author thinks that the quality management by the owner is mainly to form a set of mechanism and system,that is,all stuff participation in quality management,all stuff quality awareness,scientific management through the whole process,the concept of creating high quality engineering,forming the system of the continuous improvement of quality.
机译:大型水电站属于该国的主要基础设施。在开发和建设管理的过程中,该系列管理系统已被广泛实施,包括业主的责任制,招标制度,建设监督制度和项目合同管理系统,所有者面临着关于整个项目的质量管理的新主题,这将在本文中讨论。在本文中将讨论。在该项目开始建设,业主应该做好关于质量管理计划的好工作,包括确定的质量管理计划管理目标的质量,制定质量政策,建立质量管理机构等。该项目开始,应当实施质量计划的内容。作者认为主人的质量管理主要是形成一个一套机制和系统,即所有东西都参与质量管理,所有的东西质量意识,科学管理T赶紧整个过程,创造高质量工程的概念,形成了质量持续改善的系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号