首页> 外文会议>SPE Middle East Unconventional Resources Conference >Completion Advancements in the Khulud Unconventional Gas Project
【24h】

Completion Advancements in the Khulud Unconventional Gas Project

机译:Khulud非传统气体项目的完善进步

获取原文

摘要

PDO’s Khulud unconventional gas project is progressing from the Appraisal phase to the Pilot phase.This maturation of unconventional gas resources in PDO is resulting in revolutionary changes to completion designs as well as fracturing operational optimization.Safety and economic challenges to reduce operational manpower exposure,reduce cost and increase production have resulted in considerable advancement in well and operational design including: Elimination of Sub-Surface Safety Valve use on low initial rate and near liquid loading wells. Changes to velocity string designs including wellhead hang-off(enabled by SSSV elimination); designs for scale inhibitor injection and salt removal circulations as well as contingency for future plunger lift applications. Horizontal well designs including both cased and perforated and open hole designs are being implemented.
机译:PDO的Khulud非常规气体项目正在从评估阶段转向试验阶段。在PDO中的非传统气体资源的成熟导致完成设计的革命性变化以及压裂运营优化。安全性和经济挑战减少运营人力风险,减少 成本和增加的生产导致了井和操作设计的相当大,包括:消除低初始速率和液体装载井附近的亚表面安全阀使用。 更改速度串设计,包括井口挂断(由SSSV消除启用); 尺度抑制剂注入和盐去除循环的设计以及未来柱塞提升应用的应急。 正在实施包括套管和穿孔和开孔设计的横向井设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号