首页> 外文会议>International on Coastal Sediments Processes >COASTAL CHANGE FROM A MASSIVE SEDIMENT INPUT: DAM REMOVAL, ELWHA RIVER, WASHINGTON, USA
【24h】

COASTAL CHANGE FROM A MASSIVE SEDIMENT INPUT: DAM REMOVAL, ELWHA RIVER, WASHINGTON, USA

机译:来自巨大沉积物的沿海变化:坝拆除,埃尔威河,华盛顿,美国

获取原文

摘要

The removal of two large dams on the Elwha River, Washington, provides an ideal opportunity to study coastal morphodynamics during increased sediment supply. The dam removal project exposed ~21 million cubic meters (~30 million tonnes) of sediment in the former reservoirs, and this sediment was allowed to erode by natural river processes. Elevated rates of sand and gravel sediment transport in the river occurred during dam removal. Most of the sediment was transported to the coast, and this renewed sediment supply resulted in hundreds of meters of seaward expansion of the river delta since 2011. Our most recent survey in January 2015 revealed that a cumulative ~3.5 million m3 of sediment deposition occurred at the delta since the beginning of the dam removal project, and that aggradation had exceeded 8 m near the river mouth. Some of the newly deposited sediment has been shaped by waves and currents into a series of subaerial berms that appear to move shoreward with time.
机译:在华盛顿州Elwha河上取下两大水坝,在增加沉积物供应过程中研究沿海形态学性的理想机会。 坝移除项目在前储存器中暴露〜2100万立方米(〜3000万吨),并且允许这种沉积物被天然河流过程侵蚀。 在坝移除期间,河里的沙子和砾石沉积物运输率升高。 大多数沉积物被运输到海岸,这一更新的沉积物供应导致自2011年以来的河流三角洲的数百米。2015年1月的最新调查显示,累积〜350万立方米的沉积物沉积沉积物沉积 自大坝移除项目开始以来的三角洲,河口附近超过了8米。 一些新沉积的沉积物已经被波浪和电流形状成一系列似乎随着时间的推移镜头移动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号