A Study of Construction Claim Management Problems in Malaysia

机译:马来西亚建设索赔管理问题研究

获取原文
获取外文期刊封面目录资料

摘要

The frequency of claims is unavoidable given the nature of the contracts, their complexity, the number of parties involved, the risk and the pressure of time constraint in the preparation of the contract documents and the realisation of the work. The significantly increasing number of construction claims indicates the need for the implementation of an effective construction claim management. This paper will look into claim problems experienced by Malaysian contractors in construction projects. To achieve this, questionnaires survey were conducted involving the contractors and consultants. The findings indicate that the lack of site staff awareness to proactively detect claims, inaccessibility or unavailability of relevant documents, and conflicts which arises during owner/contractor negotiation are all critical problems associated with the process of claim management. The problems observed from this research could be used to solve or improve the contractors' claim management system.
机译:鉴于合同的性质,涉及的缔约方的性质,涉及的各方数量,在编制合同文件的准备和实现工作的情况下,索赔的频率是不可避免的。 越来越多的施工权利要求表明需要实施有效的施工索赔管理。 本文将研究马来西亚承包商在建筑项目中经历的问题。 为实现这一目标,涉及承包商和顾问的调查调查。 调查结果表明,缺乏现场员工意识,主动检测有关文件的索赔,无法访问或不可用,以及在所有者/承包商谈判期间出现的冲突是与索赔管理进程相关的关键问题。 本研究观察的问题可用于解决或改善承包商的索赔管理系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号