首页> 外文会议>POWER-GEN Middle East Conference >Best Way Of Savings in ME Utilities
【24h】

Best Way Of Savings in ME Utilities

机译:我的公用事业的最佳储蓄方式

获取原文
获取外文期刊封面目录资料

摘要

In today’s energy world, a lot of research and development has been invested in finding optimal ways and means to harness naturally available energy, whereas the equally important issue of optimization of the grid systems for various load patterns, (that is baseload, intermediate load and peaking load) remains to be studied in depth. In this paper we will use three different examples to explain how baseload is indeed required but robust, flexible power plants are equally important and a necessary part of a resilient grid system. ‘Smart Power Generation’, a concept introduced by Wartsila, is the first major step in this direction. Our three examples will be CAISO (Californian Independent System Operator), from California, USA; NEPCO (National Electric Power Company), based in Amman, Jordan; and ADWEA (Abu Dhabi Water and Electric Authority), headquartered in Abu Dhabi, UAE. Our analysis sets a strong foundation, reinforcing the idea that serious consideration is mandatory before any tender is floated for flexible power for the optimization of the grid system. Said analysis, with its underlined results, reveals that future power that needs to be added into the power system can be anything but Combined Cycle Gas Turbine (CCGT). The utilities in ME are already overburdened with CCGT power plants. Adding further CCGTs would be putting the already inflexible grid system under pressure to take up flexible load. The decisive fact is that CCGTs are not designed to take up the role of a flexible power provider. As a basic rule, the technology that needs to be added in the grid system must qualify not only in terms of technical and environmental regulation but also economic grounds.
机译:在当今的能源世界中,已经投入了许多研究和开发,以找到利用自然可用的能量的最佳方式和手段,而各种负载模式的电网系统优化的同样重要的问题(即巴塞尔,中间负载和峰值负荷仍然是深入研究。在本文中,我们将使用三个不同的例子来解释基础加载的确切需要,但强大的,灵活的电厂同样重要,并且弹性网格系统的必要部分。 “智能发电”是Wartsila介绍的概念,是朝这个方向的第一个重大步骤。我们的三个例子将是Caiso(加利福尼亚州独立系统运营商),来自美国加利福尼亚州; NEPCO(国家电力公司),位于约旦安曼;和阿布扎比总部位于阿联酋的阿布扎比​​(Abu Dhabi Water Affication)。我们的分析奠定了坚实的基础,加强了在任何招标浮动到灵活的电网系统的灵活性之前,强制考虑是强制性的想法。所述分析具有带下划线的结果,揭示了需要添加到电力系统中的未来功率可以是组合循环燃气轮机(CCGT)的任何东西。我的公用事业公司已经过负重,CCGT发电厂。添加更多CCGT将使已经不灵活的网格系统在压力下放大,以占用灵活的负载。决定性的事实是,CCGT不能旨在占用灵活电力提供商的作用。作为基本规则,需要在网格系统中添加的技术不仅必须在技术和环境监管方面有资格获得经济理由。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号