首页> 外文会议>Taishan Academic Forum >Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste
【24h】

Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste

机译:采矿条柱粘贴期间覆盖层岩层运动规律研究

获取原文

摘要

The movement law of overburden strata in backfill mining face was studied, by the method of similar material simulation, on the background of the paste filling mining in Daizhuang Coal Mine, and in consideration of change of filling body strength with time. The results showed that the immediate roof by caving method can be converted to basic roof by full mining and full backfill, and they can keep force transfer in advance direction. The roof structure of "coal pillar-coal wall" became the roof structure of "coal pillar-filling body-coal wall" in the process of fill mining, which can control mining subsidence effectively.
机译:通过类似材料仿真的方法研究了回填采矿面的覆盖层岩层的运动规律,在大寨煤矿粘贴灌浆矿井的背景下,考虑到填充体强度随时间的变化。 结果表明,通过全部采矿和完整的回填可以通过塌陷方法立即屋顶转换为基本屋顶,并且它们可以以先进的方向保持力转移。 “煤柱煤墙”的屋顶结构成为填充采矿过程中“煤柱灌装体煤墙”的屋顶结构,可有效控制矿山塌陷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号