Numerous Technological Improvements Slash Drilling Times in the Horn River Basin

机译:霍恩河流域的众多技术改进落下钻井时间

获取原文

摘要

Drilling Performance has improved multifold in the Horn River Basin since the start of activity about four years ago.In its early days a typical well would take about 40 days to drill from spud to cementing the production casing.A range of improvements have happened over the course of last four years which have reduced the drilling time by a factor of 3 despite the wells getting more complex. A number of different technologies have been applied in order to bring these improvements.Some of the examples are pad rig moving system,bigger drill pipe,rotary steerables,managed pressure drilling,high temperature motor elastomers along with time tested project management practices of performance monitoring and improvement by comparison with yardsticks established to challenge the status quo. One such measure of performance is meters per day average achieved from spud to rig release.Some of the recent wells which were drilled to around 5000m accomplished 438 m/day which is an industry record in the Horn River Basin.This was not just a onetime feat.The same performance was repeated on the next two wells. Drilling for Gas in Western Canada is challenged by the price of gas in the current economic environment.Cost cutting by performance improvement provides the means of meeting the challenges posed by this environment.In comparison to the early wells the recent performance offers a cost reduction of 40Million dollars over the course of a 20 well pad,which is significant in determining the net present value of the asset. Horn River Basin Horn River Basin is the third largest resource play in North America and is located in North Eastern part of the British Columbia province of Canada.The nearest inhabitation is the small city of Ft Nelson.The shale package at about 2500m TVD is up to 320m thick in the Ft Nelson area.Although first described in 1922 from an outcrop on the banks of Horn River, a tributary of the Mackenzie River,the first exploratory activity for Shale Gas was not until 2006-7[1]. The target in this basin are three gas bearing formations namely Muskwa,OtterPark and Evie which are tight shales and require fracturing in order to release gas.The field development plan calls for multiple parallel horizontal wells drilled at around 300-400m spacing determined by the fracture propagation lengths in each formation.The horizontal is then fractured at regular intervals along the length.
机译:钻井性能在大约四年前开始的活动开始以来的霍尔河流域。在其初期典型的井将需要大约40天的时间来从斯佩努布巩固生产套餐。通过了一系列的改善尽管井中变得更加复杂,但仍将钻井时间减少了3倍的钻井时间。已经应用了许多不同的技术,以便带来这些改进。这些示例是垫钻机系统,较大的钻杆,旋转转向装置,锻造压力钻孔,高温​​电机弹性体以及时间测试的性能管理实践。通过与建立的尺寸挑战现状的尺度相比,改善。一种这样的性能衡量标准是从Spud到钻机释放的平均水平。近期钻孔的井中的一定程度为438米/日,这是霍恩河流域的行业记录。这不仅仅是一个淫乱壮举。在接下来的两个井里重复了相同的表现。加拿大西部天然气钻探受此经济环境中的天然气价格挑战。通过绩效改善的削减削减提供了满足这一环境所带来的挑战的手段。与早期井中的比较,最近的性能提高了成本降低在20井垫的过程中40米,这在确定资产的净目前具有重要意义。 Horn River Babin Horn River河流域是北美的第三大资源游戏,位于加拿大不列颠哥伦比亚省北部的东北部。最近的居住是FT Nelson的小城市。大约2500米的Shale套餐是Up在FT纳尔逊地区厚达320米。虽然1922年首次描述的山河河岸的露头是Mackenzie River的支流,页岩气的第一个探索性活动直到2006-7 [1]。该盆中的目标是三个煤气轴承组织,即麝香,奥特尔顿乐园和eDIE,其中是紧张的Shales,并需要压裂以释放气体。现场开发计划要求多个平行水平井钻出约300-400米的间距,由骨折确定每个形成中的传播长度。然后沿长度定期间隔破坏水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号