首页> 外文会议>Hydrovision International Conference and Exhibition >SMALL HYDRO TULLOCH HYDROELECTRIC PROJECT 3RD UNIT ADDITION
【24h】

SMALL HYDRO TULLOCH HYDROELECTRIC PROJECT 3RD UNIT ADDITION

机译:小型水力塔洛赫水电项目第3单位添加

获取原文

摘要

The Tri-Dam Project, a joint venture of the South San Joaquin Irrigation District and Oakdale Irrigation District, owns and operates the Tulloch Hydroelectric Project, FERC No. 2067, near Jamestown, California, where a new, hydroelectric powerhouse addition was recently completed. Tulloch Dam, on the mainstem Stanislaus River, was completed in 1957 and included a powerhouse containing two turbine-generators, with a combined capacity of 18.7 MW. A new FERC license was issued on February 16, 2006, which included the addition of a third turbine-generator, bringing the total installed capacity of the project to 25.9 MW. The new 7.2 MW unit is expected to produce an average of 16.166 GW-hrs per year in additional power generation. This power qualifies for renewable energy credits (RECs) and is eligible for certification under California’s renewable portfolio standard (RPS). This paper presents a summary of the design, equipment considerations, construction, and environmental compliance efforts for this new small hydro project.
机译:Tri-Dam项目是南部Jaaquin灌溉区和奥克代尔灌区的合资企业,拥有和经营Tulloch水电项目,加利福尼亚州詹姆斯敦附近的Tulloch水力发电项目,最近完成了一个新的水力发电加薪。 Tulloch Dam在主节斯坦尼斯河河上,于1957年完成,包括一个包含两个涡轮发电机的强大能力,综合容量为18.7兆瓦。新的FERC许可证于2006年2月16日发布,其中包括添加第三涡轮发电机,将该项目的总装机容量带到25.9兆瓦。预计新的7.2 MW单位将在额外的发电中每年平均生产16.166吉隆坡。此权力符合可再生能源信用(RECS),并符合加州可再生产品组合标准(RPS)的资格。本文介绍了这一新的小型水力项目的设计,设备考虑,施工和环境合规努力摘要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号