首页> 外文会议>World FRIEND conference >Choosing metrics that matter - quantifying performance to help address reservoir operation challenges in Kenya's Tana basin
【24h】

Choosing metrics that matter - quantifying performance to help address reservoir operation challenges in Kenya's Tana basin

机译:选择物质的指标 - 量化性能,以帮助应对肯尼亚的塔纳盆地的储层运营挑战

获取原文

摘要

A system of five hydropower plants on Kenya's Tana River (the Seven Forks project) currently provides three-quarters of Kenya's electricity. Operating the hydropower dams to support economic development without reducing hydropower generation, water supplies or ecological function is a challenge. We developed a range of performance metrics within an open-source water resources simulator (IRAS-2010) to help gauge success in this effort. Modifying reservoir operating rules enhances performance in particular metrics but lowers others, demonstrating the existence of trade-offs. Financial benefits of hydropower generation and agriculture are assessed alongside non-monetary benefits accruing from a natural flow regime. Pre-dam development flow time-series are used to represent both the range of hydrological conditions experienced in the basin and the ecological flow requirements. The maximum-to-minimum ratio of individual performance metrics varies from 1.75 to ∞ (where zero is the best performance) suggesting different operating rules lead to a wide range of performances.
机译:肯尼亚塔纳河(七叉项目)的五种水电站系统目前为四分之三的肯尼亚电力提供。经营水电坝以支持经济发展而不减少水电站,水供应或生态功能是挑战。我们在开源水资源模拟器(IRA-2010)中开发了一系列性能指标,以帮助衡量衡量此努力的成功。修改水库操作规则提高了特定度量的性能,但能够降低他人,证明了权衡的存在。水电站和农业的财务效益与自然流动制度的非货币效益一起评估。预防坝开发流程时间系列用于表示盆地中经历的水文条件范围和生态流动要求。单个性能度量的最大比例从1.75变化到△(其中零是最佳性能),表明不同的操作规则导致各种性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号