首页> 外文会议>ALTA Gold-Precious Conference >COMMISSIONING AND RAMP UP OF THE ALBION PROCESS AT THE GPM GOLD PROJECT
【24h】

COMMISSIONING AND RAMP UP OF THE ALBION PROCESS AT THE GPM GOLD PROJECT

机译:GPM Gold项目中的Albion流程调试和增加

获取原文

摘要

The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced in 1976, and focused on near surface oxide ores, which overlay deeper refractory sulphides. Historical mining has now almost depleted the oxide ores, and the sulphide content of ore delivered to the processing plant at Ararat is increasing. Gold and silver recoveries through the Ararat plant were declining steadily. GeoProMining, the owners of the project, have expanded the Ararat facility to deal with the increasing sulphide content in the ore. In 2014, GeoProMining refurbished an existing concentrator on site to recover a sulphide concentrate from the ore, and have constructed an Albion Process? plant to oxidize the refractory concentrate. Glencore Technology (GT) provided the Albion Process? plant as a technology package. In July 2014, the progress of the GPM Gold Project Albion Process? Plant was reported (Hourn, Voigt and Turner, 2014). At the time of writing, the construction of the plant was nearly complete. This paper presents an update of project progress, covering commissioning and ramp up of the GPM Gold Project. The commissioning phase occurred over June to August 2014, which included an M3,000 IsaMill~(TM) fine grinding plant, a 6 tph limestone milling plant, a 60 tpd vacuum pressure swing adsorption oxygen plant, a 10m residue thickener and a 12tph Albion Process? oxidative leach plant. Since commissioning was completed, ramp up occurred over the following three months with downstream gold recoveries from cyanide leaching reaching over 98%.
机译:GPM Gold项目位于亚美尼亚,由Zod,在阿塞拜疆边境附近的Zod开放的矿山组成,以及土耳其边境附近Ararat的CIL加工厂。在Zod开采于1976年,并专注于近表面氧化物矿石,其覆盖深层耐火硫化物。历史开采现在几乎耗尽了氧化物矿石,矿石的硫化物含量递送到亚拉沙拉的加工厂正在增加。通过Ararat植物的金和银回收率稳步下降。地理工地,该项目的业主,扩大了Ararat设施,以应对矿石中的硫化物含量增加。 2014年,地理调节翻新现有的浓缩器,以回收来自矿石的硫化物浓缩物,并建造了汉语替代方法?植物氧化耐火浓缩物。 Glencore Technology(GT)提供了Albion过程吗?工厂作为技术包。 2014年7月,GPM Gold Project Albion流程的进度?据报道植物(ROMN,Voigt和Turner,2014)。在撰写本文时,植物的建设几乎完成。本文提出了项目进展的更新,涵盖了GPM Gold项目的调试和加速。调试阶段发生在6月至2014年8月,其中包括一个M3,000 Isamill〜(TM)精细研磨厂,6PPL石灰石铣削厂,60 TPD真空升温吸附吸附氧气植物,10M残基增稠剂和12tph过程?氧化浸出厂。自调试完成以来,升压发生在以下三个月内,来自氰化物浸出的下游金回收率达到98%以上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号