首页> 外文会议>International conference on flood recovery, innovation and response >Implementing tools to meet the Floods Directive requirements: a 'procedure' to collect, store and manage damage data in the aftermath of flood events
【24h】

Implementing tools to meet the Floods Directive requirements: a 'procedure' to collect, store and manage damage data in the aftermath of flood events

机译:实施工具以满足洪水指令要求:收集,存储和管理洪水事件的后果中的“程序”

获取原文

摘要

The aim of this paper is to present a "procedure" to collect and store damage data in the aftermath of flood events. The activity is performed within the Poli_RISPOSTA project (stRumentI per la protezione civile a Supporto delle POpolazioni nel poST Alluvione), an internal project of Politecnico di Milano whose aim is to supply tools supporting Civil Protection Authorities in dealing with flood emergency. Specifically, the aim of this paper is to discuss the present implementation of the project, highlighting challenges for data collection, storage, analysis and visualisation. Data can have different formats (e.g. paper based vs. digital form, different digital files extensions), refer to different aspects of the phenomenon (i.e. hazard, exposure, vulnerability and damage), refer to different spatial and temporal scales (e.g. micro vs. meso scale, different phases of the flood event) and come from different sources (e.g. local authorities, field surveys, crowdsourcing). Therefore a multidisciplinary approach which includes expertise from ICT, geomatics, engineering, urban planning, economy, etc. is required. This paper first describes a conceptual map of the issue at stake, then it discusses the state of the art of the implementation, taken as reference the Umbria flood in November 2012. Impacts of the project are discussed with particular attention to their utility to meet some of the "Floods Directive" (Directive 2007/60/EU) requirements: (ⅰ) to create a reliable and consistent database; the latter should be the basis on which damage models can be defined/validated and thus risk can be mapped; (ⅱ) to supply a comprehensive scenario of flood impacts according to which priorities can be identified during the emergency and recovery phase.
机译:本文的目的是在洪水事件的后果中收集和存储损坏数据的“程序”。该活动是在Poli_risposta项目中进行的(每个La Protezione Civile的STRIMALII ARESTO DELLE PANOLAZIONI NEL POST ALLUVIONE),这是POLITECNICO DI MILANO的内部项目,其目的是提供支持民事保护当局的工具,以处理洪水紧急情况。具体而言,本文的目的是讨论该项目的目前的实施,突出了数据收集,存储,分析和可视化的挑战。数据可以具有不同的格式(例如,基于纸张与数字形式,不同的数字文件扩展),参见现象的不同方面(即危险,曝光,漏洞和损坏),指的是不同的空间和时间尺度(例如Micro Vs.中间规模,洪水事件的不同阶段)并来自不同来源(例如地方当局,现场调查,众包)。因此,包括ICT,地理,工程,城市规划,经济等专业知识的多学科方法。本文首先描述了股权问题的概念图,然后讨论了实施的艺术的状态,作为2012年11月的翁布里亚洪水。讨论了该项目的影响,特别注意他们的效用以满足他们的效用“洪水指令”(指令2007/60 /欧盟)要求:(Ⅰ)创建可靠且一致的数据库;后者应该是可以定义/验证损坏模型的基础,因此可以映射风险; (Ⅱ)根据紧急情况和恢复阶段可以识别的优先事项,提供全面的洪水影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号