首页> 外文会议>International Conference on Process Equipment, Mechatronics Engineering and Material Science >The Application of ROV for the Subsea Christmas tree Installation in the LiWan3-1 Deepwater Oilfield
【24h】

The Application of ROV for the Subsea Christmas tree Installation in the LiWan3-1 Deepwater Oilfield

机译:ROV在荔湾3-1深水油田中的海底圣诞树安装中的应用

获取原文

摘要

China's offshore oil and gas has been developed from shallow water to deep water. Subsea production facilities play more and more role in deepwater oil and gas fields, in which Christmas tree is the key equipment to control and regulate the oil well production of deepwater production systems, but it has great installation costs and risk. For complex underwater environment, it is necessary to find a best way to install the Christmas tree securely and rapidly. ROV (Remotely Operated Vehicle) is wildly used in the field of offshore oil, especially in deep water for its large working depth, safe, efficient and other characteristics, and it has become an indispensable tool for development of deep-sea oil and gas. In one Christmas tree installation at Liwan3-1 deepwater oilfield, the ROV succeeded in assisting the installation of Christmas tree. The solutions for winding and wrong operation risk in installation process are given in the end.
机译:中国的离岸石油和天然气已从浅水中开发到深水。海底生产设施在深水油和天然气场中发挥越来越多的作用,其中圣诞树是控制和调节油井生产的主要设备,但它具有很大的安装成本和风险。对于复杂的水下环境,有必要找到安全和快速安装圣诞树的最佳方式。 ROV(远程操作的车辆)在海上石油领域野外使用,特别是在深水中,用于其大的工作深度,安全,高效等特点,它已成为深海石油和天然气发展的不可或缺的工具。在荔湾3-1深水油田的一个圣诞树安装中,ROV成功地帮助安装了圣诞树。最终给出了安装过程中绕组和错误运行风险的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号