首页> 外文会议>SPE Canadian Unconventional Resources Conference >Reservoir and Drilling Engineering Combined Effort to Develop a Naturally Fractured Over Pressured Shale Formation: Understanding and Operational Specific Procedures
【24h】

Reservoir and Drilling Engineering Combined Effort to Develop a Naturally Fractured Over Pressured Shale Formation: Understanding and Operational Specific Procedures

机译:水库和钻井工程综合努力开发自然骨折的压力页岩地层:理解和操作具体程序

获取原文
获取外文期刊封面目录资料

摘要

In the area of this study, the Quintuco-Vaca Muerta complex is an ultra-low permeability, highly over pressured, laminated calcareous and shaly rock that extends over 5000 km2 with an average gross thickness of 700 m. It overlies some 30 meters of what is known as the kitchen of Vaca Muerta, a world-class, high TOC source rock, the main source rock for the Neuquen basin in Argentina. Whenever found naturally fractured, it can produce high quality oil at attractive initial choked rates as high as 1500 bopd. Historically, throughout many drilling campaigns, it has been very difficult to anticipate where it will have enough good reservoir properties such as to grant a commercial completion. Many times in the past decades, as soon as the wells showed important kicks during the drilling phase in Quintuco-Vaca Muerta, the wells were completed without any further evidences other than high initial productivity indexes. This led more often than not, to wrong decisions and the completions turned out to be sub-economical. Drilling operations through this geological sequence present severe well control related problems such as difficulties anticipating pore pressures, predicting fluid influx levels and mainly the fact that an increase in mud weight in most of the wells, instead of leading to well control, exacerbates formation fluid kicks and influx pressure. Combining geological knowledge, production history, downhole pressure while drilling (PWD), surface underbalanced drilling (UBD), mud logging data and drilling experience, a specific underbalanced drilling methodology was developed assuming one main hypothesis which is that in some areas of the field, the formation is naturally fractured and it is potentially critically stressed. This drilling methodology defines how the optimum mud weight is identified," how to deal with formation fluid influx and the well killing procedure; additionally a "dynamic soft well shut-in method" was defined. An integrated effort of drilling and reservoir engineering allowed the operator to design and execute a meaningful short reservoir limit test mat facilitated the evaluation in real time of the size of the accumulation and the reaching of an informed decision on whether or not to complete the well from this interval.
机译:在本研究领域,Quintuco-Vaca Muerta复合物是超低的渗透性,高度压力,层压的钙质和谢利岩石,延伸超过5000公里的宽度,平均厚度为700米。它覆盖了大约30米的所谓的厨房,世界一流的高Toc源岩,是阿根廷Neuquen盆地的主要来源岩。每当发现自然骨折时,它可以以高达1500个BOPD的有吸引力的初始窒息率生产高质量的油。从历史上看,在许多钻探运动中,它一直很难预测它将有足够的良好水库属性,例如授予商业完成。在过去几十年中,一旦井在Quintuco-Vaca Muerta的钻井阶段,井在钻井期间出现了重要的踢球,井就完成了井,而不是高初始生产力指数以外的任何进一步证据。这比没有出错的决策和完成的那样往往是潜水的。通过这种地质序列钻探操作呈现严重的良好控制相关问题,例如预期孔隙压力的困难,预测流体流入水平,主要是大部分井中的泥浆重量增加,而不是良好的控制,加剧形成流体踢血和流入压力。结合地质知识,生产历史,井下压力,同时钻井(PWD),表面底层钻井(UBD),泥浆测井数据和钻井经验,特定的钻井方法是制定了一个主要假设,这是在该领域的某些地区,形成自然裂缝,并且可能受到批判性的压力。这种钻孔方法定义了如何确定最佳泥浆重量,“如何处理地层流体流入和良好的杀戮程序;另外,定义了”动态软良好的关闭方法“。钻井和水库工程的综合努力允许操作员设计和执行有意义的短储层限制测试垫,促进了积累规模的实时评估,并达到了关于是否从本间隔完成井的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号