首页> 外文会议>NATC North Africa Technical Conference >Cost-Effective Recovery of Bypassed Reserves Using Rigless Cement Packer Completion Technique: Case History from Offshore Egypt
【24h】

Cost-Effective Recovery of Bypassed Reserves Using Rigless Cement Packer Completion Technique: Case History from Offshore Egypt

机译:使用严格的水泥包装机完成技术经济高效的旁路储备恢复:埃及近海的案例历史

获取原文

摘要

In many Brownfield developments, toward the end of a well’s life cycle, the primary production zone(s) commonly waters out or depletes, or the well sits idle with no alternative means of returning back to production. At this stage, as a normal course of action, the wells are re-evaluated for potential reserves that might have been bypassed during the original completion. For zones that do not appear promising or could be marginal in terms of delivery, the recompletion costs can be prohibitive. It is in such situations that “cement packer” completions performed rigless in offshore environments provide an economic alternative to workover operations. This technique can be cost-effective and has the potential to increase the producing life of a well. This paper describes the successful application of a “cement packer” to recover bypassed reserves located above the production packer in an offshore field in the Mediterranean Sea. The technique allows zonal isolation between the various upper zones by placing cement slurry in the production tubing and casing annulus. Conceptually, it might appear simple to perform such a job, but the planning and execution must be well formulated to ensure well integrity is maintained at all times. In this case history, the challenges of executing the job were examined from many different angles (i.e., high angle well, small platform, short weather window for operations, and multiple job sequences). The average cost was only 20 to 60% of conventional workover jobs, which is a savings of up to USD 400,000. The production results have also been encouraging. These successful results have revealed opportunities for reactivating many more shut-in wells with bypassed reserves that are currently considered economically marginal.
机译:在许多布朗菲尔德的发展中,朝向井的生命周期结束时,主要生产区通常是散流或耗尽,或者井闲置,没有替代方法回归到生产。在这个阶段,作为正常的行动过程,井被重新评估了在原始完成期间可能被绕过的潜在储备。对于在交付方面没有出现承诺或可能是边缘的区域,重新完成成本可能是令人无尊的。它处于这种情况下,“水泥包装机”完成在近海环境中进行严格,提供了工作组的经济替代方案。这种技术可以具有成本效益,并且有可能增加井的产生寿命。本文介绍了“水泥封隔器”的成功应用,以恢复位于地中海的海上地区的生产包装机上方的旁路储备。该技术允许通过将水泥浆料放置在生产管和壳体环中的各种上部区域之间的区域隔离。概念上,执行这样的工作可能看起来很简单,但规划和执行必须妥善配制,以确保始终保持完整性。在这种情况下,从许多不同的角度检查执行工作的挑战(即,高角度阱,小平台,用于操作的短天气窗口以及多个作业序列)。常规工作台工作的平均成本仅为20%至60%,储蓄高达400,000美元。生产结果也令人鼓舞。这些成功的结果揭示了重新加入许多细胞井的机会,旁路储量目前被认为是经济的边缘。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号