首页> 外文会议>International Workshop on Mine Hazards Prevention and Control >Study on Gob-side Entry Retaining Technology with Roadway Anchor Net Waste Bag Wall
【24h】

Study on Gob-side Entry Retaining Technology with Roadway Anchor Net Waste Bag Wall

机译:巷道锚净净废物袋墙上的GOB侧入口挡土技术研究

获取原文

摘要

Due to the problems of large waste massive residual space, and lower axial load and lateral pressure capacity existed in the gob-side entry retaining technology with waste bag wall, the surrounding rock of the gob-side entry retaining results in great deformation. Combined with the geological conditions of Wang-Lou coal mine field, this paper puts forward the gob-side entry retaining technology with roadway the anchor net waste rock bag wall, which makes use of the waste rock bag, anchor bolt net, protective steel belt and anchor cable and other supporting to be a whole, laying anchor bolt net on the lateral wall, and two-way fastening the wall with protective steel belt and anchor cable joint action, so the wall can be with uniform compression and strong compactness, which improves the waste bag wall's compression capability and overall support performance. Along with successful application of the gob-side entry retaining technology with roadway anchor net waste bag wall in Wang-lou coal mine, it provides a new technical way for gob-side entry retaining.
机译:由于大型废物剩余空间的问题,在GOB侧进入挡土技术中存在较低的轴向载荷和横向压力容量,用废袋壁,血管侧进入的周围岩石保持良好的变形。结合王楼煤矿领域的地质条件,本文提出了巷道锚杆净废弃岩袋墙上的GOB侧入口挡土技术,这是利用废岩袋,锚螺栓网,防护钢带和锚点电缆和其他支撑是一个整体,铺设锚杆上的侧壁,双向紧固墙上用保护钢带和锚点线圈动作,所以墙壁可以具有均匀的压缩和强大的紧凑性提高废袋墙的压缩能力和整体支持性能。随着GOB侧入口挡土技术的成功应用王楼煤矿走廊锚净废钢墙,它为GOB侧进入挡土提供了一种新的技术方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号