首页> 外文会议>ISRM SINOROCK symposium >Combined test research on coal-rock pillar width setting of district sublevel for fully-mechanized face with large mining height
【24h】

Combined test research on coal-rock pillar width setting of district sublevel for fully-mechanized face with large mining height

机译:大型采矿高度综采脸部煤岩柱宽度设定综合试验研究

获取原文

摘要

Reasonable width of district sublevel coal-rock pillar is the premise of scientific mining for a safe and high efficient mine.they all indicate that,the setting width of forty meters coal pillar is obviously large in Ningdong test mine now,by the analysis of FLAC3D numerical simulation based on ideal elastoplastic theory and engineering practice results of many mines.The in situ test under the mine involves real-time monitoring of sixteen hollow inclusions' 3-D strain,dynamic monitoring of surrounding rock stress and deformation in test roadways with different coal pillar width (10m & 20 m) before and after the mining-induced influence by the workface.Combination of the above theoretical calculations,simulation and underground test results are considered to determine a reasonable width scope of district sublevel coal pillar design from 8.9 meters to 11.9 meters in the test mine under specific geological condition,which provides some guiding role for width design method of district sublevel coal-rock pillar under similar mining conditions.
机译:合理的宽度宽度煤岩柱是安全高效矿山科学矿业的前提。这一切都表明,煤柱的四十米煤支柱的设定宽度在宁德试验中明显大,通过FLAC3D分析了矿井。基于理想弹塑性理论和工程实践结果的数值模拟许多矿山。矿井原位试验涉及六十型空心夹杂物的实时监测,围岩岩体应变的动态监测,不同的试验道路中的变形煤柱宽度(10m&20米)在挖掘诱导的工作场所的影响之前和之后的工作场。通过上述理论计算,模拟和地下试验结果被认为是从8.9米到8.9米的地区雪内煤柱设计的合理宽度范围在特定地质条件下,在测试矿井中为11.9米,为区区SUBL的宽度设计方法提供了一些指导作用在类似的采矿条件下evel煤岩柱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号