首页> 外文会议>International Symposium on Geomatics for Integrated Water Resources Management >Planning and effect evaluation for vegetative filter strips in water source area based on model simulation
【24h】

Planning and effect evaluation for vegetative filter strips in water source area based on model simulation

机译:基于模型仿真的水源区营养滤波条规划与效应评价

获取原文

摘要

Vegetative filter strip (VFS) is a new kind of ecological engineering measure for the control of nonpoint source pollution. For investigating the application of mathematical models in the planning and designing of vegetative filter strip, the vegetative filter strip hydrology and sediment transport model (VFSMOD) was used to analyze the effect of VFS' width and slop on the sediment load removal rate in Heihe water source area, thus determining the appropriate planning scheme of vegetative filter strip. Subsequently, the linear relationships between the unit load of TP, TN and unit sediment were used to estimate the watershed nonpoint source pollution load reduction efficiency of VFS. The results showed that the grass filter strips with width in the range of 3 ∼ 5 m was advisable and should not be used on slopes with gradient of higher than 60°; when VFS was constructed on parts of sensitive riparian in the water source area, the incoming load of sediment, TP and TN could be reduced by 22.14, 12.66 and 14.60%, respectively. VFS could play an important role in the water quality protection of Heihe water source area.
机译:营养过滤条(VFS)是一种用于控制非点源污染的新型生态工程措施。为了调查数学模型在营养过滤条的规划和设计中的应用,使用营养过滤条水文和沉积物传输模型(VFSmod)来分析VFS宽度和倾斜对黑河水中沉积物负荷去除率的影响源区,从而确定营养过滤条的适当规划方案。随后,使用TP,TN和单元沉积物的单位负载之间的线性关系来估计VFS的流域的非点源污染负载效率。结果表明,宽度在3〜5米范围内的草滤网条带是可取的,不应在梯度高于60°的斜坡上使用;当VFS在水源区域中的敏感河南体的部分构造时,沉积物,TP和TN的进入负荷分别可以减少22.14,12.66和14.60%。 VFS可以在黑河水源区的水质保护中发挥重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号