首页> 外文会议>AusIMM International Uranium Conference >Improvements in Hydrometallurgical Uranium Circuit Capital and Operating Costs by Water Management and Integration of Utility and Process Energy Targets
【24h】

Improvements in Hydrometallurgical Uranium Circuit Capital and Operating Costs by Water Management and Integration of Utility and Process Energy Targets

机译:通过水管理和效用和工艺能量目标的整合改进液压冶金铀电路资金和运营成本

获取原文

摘要

Recovery of uranium from low-grade ores often results in hydrometallurgical processing plants that operate at low uranium concentration, high volumetric flow rates and relatively large-sized equipment.Focusing on water management and integration of utility and process energy targets provides significant opportunities to reduce capital and operating costs of uranium hydrometallurgical circuits.The effect of stream composition on the capital cost is examined using an alkaline leach uranium hydrometallurgical circuit with direct uranium precipitation as an example. Alternatives for removal of water from the circuit are compared technically and economically.The energy requirements for the process and utilities are examined using energy targets. The integration of the process and utility heat flows reduce energy consumption and provides energy for water removal.The capital and operating cost savings for the circuit are quantified and are shown for an improved flow sheet.
机译:从低级矿石中恢复铀经常导致液压冶金加工厂,其在低铀浓度下操作,高容量流量和相对大的设备。汇集水管理和效用的整合和工艺能量目标提供了减少资本的重要机会 铀冶金电路的运营成本。使用具有直接铀沉淀的碱性浸出铀液冶金电路检查流成对资本成本对资本成本的影响。 技术和经济地比较从电路中除去水的替代方案。使用能量目标检查过程和公用事业的能量要求。 该过程和效用热流的整合降低了能量消耗,并为除水分提供能量。电路的资本和运营成本节省量化,并显示出改进的流量表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号