【24h】

Failure process analysis on overload of arch dam

机译:拱坝过载失败过程分析

获取原文

摘要

Arch dam's failure is a super nonlinear irreversible process. We can find the damage mechanism from research of it and get a more reasonable and perceive safety factor. It analyses overload of the highest RCC arch dam of the world and shows dam's failure process by water specific gravity overcharge method and water-level overcharge method. It gets overload safety factor from study on arch dam's failure process and also gives the reason that why different methods get different safey factor.
机译:Arch Dam的失败是超级非线性不可逆过程。我们可以找到损坏机制,并获得更合理和感知安全因素。它分析了世界上最高RCC拱坝的过载,并通过水比重力过充电方法和水位过充电方法显示了大坝的故障过程。它从拱门大坝的失败过程研究中获取过载的安全因素,并且还给出了不同方法获得不同的安全性因素的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号