首页> 外文会议>Conference on Naval warfare - critical engineering challenges >Enabling the Continuous Improvement of our Surface Navy Fleet Post Shakedown Availability (PSA) by Standardizing Execution Processes
【24h】

Enabling the Continuous Improvement of our Surface Navy Fleet Post Shakedown Availability (PSA) by Standardizing Execution Processes

机译:通过标准化执行流程,实现我们的表面海军舰队的持续改进了Shakedown可用性(PSA)

获取原文

摘要

Shipbuilding for the US Navy is a complex process involving government-industry coordination and cooperation, multiple critical milestones, integration of sophisticated ship systems, and ship-specific tailoring. Post Shakedown Availability (PSA) is the final industrial opportunity within new construction to correct ship deficiencies and accomplish authorized work prior to Shipbuilding and Conversion, Navy (SCN) Obligation Work Limiting Date (OWLD). Figure 1 portrays the major DDG 51 shipbuilding milestones, including PSA.
机译:美国海军的造船是一个复杂的过程,涉及政府行业的协调与合作,多重关键的里程碑,复杂船舶系统的整合,以及特定于船舶的裁缝。发布后展出的可用性(PSA)是在新建建设中的最终工业机会,以纠正船舶缺陷,并在造船和转换之前完成授权工作,海军(SCN)义务工作限制日期(OWLD)。图1描绘了主要的DDG 51造船里程碑,包括PSA。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号