首页> 外文会议>Deep Sea Offshore Wind RD Conference >Fabrication and installation constraints for floating wind and implications on current infrastructure and design
【24h】

Fabrication and installation constraints for floating wind and implications on current infrastructure and design

机译:用于浮动风的制造和安装限制与当前基础设施和设计的影响

获取原文

摘要

Industrialization of floating wind technology is key for future cost reductions to become competitive. Within the scope of the LIFES50+ H2020 research project, the floating-specific constraints with respect to fabrication, assembly and installation for different floating substructure concepts are investigated for large future 10MW floating wind turbines and 500MW wind farms. The presented study focusses on three selected LIFES50+ sites in the Scottish North Sea, French Mediterranean and Gulf of Maine. General constraints are identified, which are not specific for a certain proprietary concept, but depending on the material, concept type, fabrication, assembly and installation procedures and site location.
机译:浮动风技术的工业化是未来成本降低成为竞争的关键。 在Lifes50 + H2020研究项目的范围内,针对不同浮动子结构概念的制造,装配和安装的浮动特定约束是针对大型未来10MW浮风风力涡轮机和500MW的风电场进行了调查。 本研究的研究侧重于苏格兰北海,法国地中海和缅因湾的三个选定的Lifes50 +地点。 识别一般约束,这对于某个专有概念不具体,而是根据材料,概念类型,制造,装配和安装程序和站点位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号