首页> 外文会议>IABSE conference >BIM and Forensic Structural Engineering: strengthening and repairing a post-tension concrete slab bridge
【24h】

BIM and Forensic Structural Engineering: strengthening and repairing a post-tension concrete slab bridge

机译:BIM和法医结构工程:加强和修复后张力混凝土板桥

获取原文

摘要

The forensic engineering investigation carried out to determine the possible causes of cracking in a post-tension concrete slab bridge and the rehabilitation proposed is explained in this paper. The followed methodology includes new technologies making up a complete BIM model in LOD 400 with all the reinforcements and post-tensioning tendons and exporting it to Advanced FEA software in order to analyze and investigate the causes of the cracking.
机译:本文解释了在张紧后混凝土板桥中确定开裂的可能原因和提出的康复所进行的法医学工程调查。遵循的方法包括在LOD 400中构成完整BIM模型的新技术,以及所有加强和张力后肌腱,并将其出口到先进的FEA软件,以分析和调查裂缝的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号