首页> 外文会议>International Meeting of Electrical Engineering Research >Simulation and analysis of underground power cables faults
【24h】

Simulation and analysis of underground power cables faults

机译:地下电力电缆故障仿真与分析

获取原文

摘要

The experience in operation of electrical equipment has shown that partial discharges shorten the life insulation systems. Therefore, the partial discharge can become the cause of serious economic losses by requiring repairs and early changes in electrical equipment, efficiency loss and safety in the operation of communication systems and disruption of service delivery energy. On the other hand, the partial discharges phenomenon also serves as a characterization parameter for incipient faults in electrical equipment. That is the reason why the study of this phenomenon is of great importance. This document presents the proposal of a partial discharges simulation model, aiming at the visualization and understanding of the phenomenon, with comparative results with respect to type of failure in a laboratory installation of underground cables, besides the partial discharge study as a tool in the characterization of faults in underground cables.
机译:电气设备运行经验表明,部分放电缩短了寿命绝缘系统。因此,局部放电可以通过需要维修和早期改变电气设备,效率丧失和运行在通信系统的操作和服务递送能量中的破坏来成为严重经济损失的原因。另一方面,部分放电现象也用作电气设备中初始故障的表征参数。这就是这种现象的研究的原因是非常重要的。本文件提出了部分放电模拟模型的提议,针对对现象的可视化和理解,除了作为表征中的局部放电研究之外,对于地下电缆的实验室安装中的失效类型的比较结果地下电缆的故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号