【24h】

Integration of HES into the Management of a Major Capital Project

机译:融入了一个主要资本项目的管理

获取原文

摘要

During the Front End Engineering Design (FEED) stage of a project; scope, cost and schedule are locked down, the plans for construction are prepared and the licences, permits and access agreements obtained. Health, Environment and Safety (HES) deliverables include: assurance that the selected design options meet corporate and regulatory standards; input to ensure that the design is safe and environmentally responsible; the execution of baseline surveys and impact assessments to obtain required permits; the development of HES exhibits; and the review of tender documentation and contractor HES management plans. These activities, although often critical to project success are typically not tracked to completion alongside other project milestones.
机译:在项目的前端工程设计(饲料)期间;范围,成本和时间表被锁定,建设计划以及获得的许可证,许可证和访问协议。健康,环境和安全(HES)可交付成果包括:保证所选的设计选项符合企业和监管标准;输入以确保设计安全和环保负责;执行基线调查和影响评估以获得所需许可; HES展品的发展;并审查招标文件和承包商HES管理计划。这些活动虽然通常对项目成功至关重要,但通常不会跟踪其他项目里程碑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号