The objective of this report is to present a summary of work performed to date on the Level 1 Internal Fire and Flood PSA for the Hydro-Québec Gentilly-2 CANDU Nuclear Power Plant. The overview will present findings, observations, challenges, and solutions that have been developed to supplement the NUREG/CR-6850 and EPRI-1019194 methodologies.
展开▼