This paper is geared in presenting a model to predict the Availability of the Generating Units (GU's) of New large Coal Fired Stations based on an expert opinion elicitation process, when the data for the Availability is not directly obtainable. The Availability used here is the Energy Availability Factor (EAF, as a percentage) as defined internationally by UNIPEDE (International Union of Producers and Distributors of Electrical Energy) [1]. The EAF is an inferred indicator, i.e. it is derived from the PCLF which is the Planned Capability Loss Factor (maintenance in %), the UCLF (Unplanned Capability Loss Factor) and the OCLF (Other Capability Loss Factor) which are the random percentage losses, the latter being out of management control. After a preliminary statistical analysis, the indications are that the UCLF is at least 300% larger than the OCLF. Therefore, it stands to reason to utilise the UCLF as a determinant for the EAF, since management can adjust the PCLF at will. The results provided are fictitious and for illustrative purpose only.
机译:本文在提出模型中,以预测基于专家意见诱导过程的新型大型燃煤站的发电单元(GU)的可用性,当不可用于可用性的数据不可能获得。这里使用的可用性是由unipeded(电能的国际制片人和经销商国际工会)(电能)[1]中定义的能源可用性因素(EAF为百分比)[1]。 EAF是推断指示符,即它来自PCLF,这是计划能力损失因子(%)的维护,UCLF(无计划能力丢失因子)和OCLF(其他能力丢失因子),它们是随机百分比损失后者失去了管理控制。在初步统计学分析之后,指示性是UCLF比OCLF大的至少300%。因此,它被推理使用UCLF作为EAF的决定因素,因为管理层可以在将调整PCLF。提供的结果是虚构的,仅用于说明目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号