Measurement and Verification methodology, challenges and lessons learned of MV on commercial heat pumps

机译:商业热泵M&V的测量和验证方法,挑战和经验教训

获取原文

摘要

Industrial and commercial electrical boilers usually found in hotels, restaurants, etc in South-Africa are used to heat water for sanitary and cleaning purposes. These boilers use electrical heating elements and as such contribute largely to the high power demand of electricity in South-Africa. By implementing Demand Side Management (DSM) measures such as installing heat pumps in parallel with the boilers and use the electrical heating elements as backup, the average daily electrical power demand can be reduced for the client and thus assist to create an overall power reduction in the national demand. Measurement and Verification (M&V) is needed to credibly and accurately determine the impact of these projects. M&V should be an independent, impartial party that provide answers to questions such as: •Was the project successfully implemented?• What is the actual impact of the DSM project? In order to answer these questions a methodology should be developed that complies with the IPMVP [1] requirements. This could include change in responsible personnel from any of the stakeholders, the actual heat pump installation, metering and metering installations, visual inspections, etc. These aspects presented challenges such as, scope changes, miscommunication between stakeholders, late project completion and thus late metering installations, approval of installations. This paper will focus on an M&V methodology for commercial energy efficient heat pumps and uses a case study to provide practical examples of challenges encountered and typical preventive actions that may reduce the risk of similar difficulties in other projects.
机译:通常在南非的酒店,餐馆等中发现的工业和商业电气锅炉用于加热水以供卫生和清洁目的。这些锅炉使用电加热元件,并因此有助于南非电力的高功率需求。通过实施需求侧管理(DSM)措施,如将热泵与锅炉并联安装热泵并使用电加热元件作为备份,为客户端可以降低平均每日电力需求,从而有助于创造整体功率降低国家需求。需要测量和验证(M&V)以可信,准确地确定这些项目的影响。 M&V应该是一个独立的,公正的党,提供了以下问题的答案:•该项目是否成功实施?•DSM项目的实际影响是什么?为了回答这些问题,应制定方法,符合IPMVP [1]要求。这可能包括来自任何利益相关者的负责人员的变更,实际的热泵安装,计量和计量装置,视觉检查等这些方面提出了挑战,如范围变化,利益相关者之间的误解,后期项目完成,因此晚期计量安装,安装批准。本文将重点关注商业节能热泵的M&V方法,并使用案例研究,提供遇到的挑战的实际例子,典型的预防措施,可能降低其他项目中类似困难的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号