首页> 外文会议>International Conference on Mountain Environment and Development >The Impact of Catastrophic Natural Disaster on Land-Use Changes of Qingping Town and Selection of Suitable Land for Settlement Construction
【24h】

The Impact of Catastrophic Natural Disaster on Land-Use Changes of Qingping Town and Selection of Suitable Land for Settlement Construction

机译:灾难性自然灾害对清平镇土地利用变化的影响及其合适土地解决施工

获取原文

摘要

Through learning experiences and lessons from the selection of resettlement areas after the occurrence of large earthquake on May 12,2008 (hereafter called May 12 earthquake) and using highresolution aerial photos and satellite remote sensing images taken before and after the May 12 earthquake and August 13 debris flow (happened on August 13,2008 in Qingping Township of Mianzhu county,Sichuan),the influence of two disasters on changes in land use and suitable construction land were analyzed through field surveys and adoption of land use transfer model and analytical model of suitable land for settlement construction in combination with RS and GIS.The results showed that the influence of the May 12 large earthquake on ecological environment was far greater than that of the August 13 catastrophic debris flow and the conflicts between human and land is even more outstanding after the earthquake.Sites for post-disaster reconstruction should not be in disaster-prone areas or in gully-facing areas.Suitable land for settlement construction in I-1~I-5 low-hazard zones is optimal settlement areas for post-disaster reconstruction.
机译:通过在2008年5月12日发生大地震发生后的重新安置区域的学习经验和经验教训(以下称为5月12日地震)并使用5月12日之前和8月13日之前和之后拍摄的高度区分航天照片和卫星遥感图像泥石流(在四川绵竹县清平乡发生的8月13日),通过现场调查分析了两次灾害对土地利用和合适的建设用地的影响的影响,采用土地使用转移模型和合适的分析模型分析结合Rs和GIS的地面结合的土地。结果表明,5月12日大地震对生态环境的影响远远大于8月13日灾难性碎片流动,人与土地之间的冲突更加出色灾后重建的地震不应在灾难的地区或沟壑面上地区。适用于I-1〜I-5低危险区的定居建设土地是灾后重建的最佳结算领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号