首页> 外文会议>International conference on railway engineering >TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY
【24h】

TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY

机译:北京 - 上海高速铁路路基与涵洞转型段建设与定居控制技术

获取原文

摘要

Subgrade and culvert has difference in stiffness and settlement,which usually causes the irregularity of stiffness and geometric.This paper,mainly aimed at the CRTS II ballastless track in Langfang section of Beijing-Shanghai High-Speed Railway,and raises the Control technology of transition section construction,including the requirements of filler,selection of construction equipment,rolling control and the quality index control.To control the irregularity of transition section between subgrade and culvert,and to meet the need of high speed train safety,comfort,uninterrupted service; Taking the settlement characteristics of two transition section subgrade and culvert,the rationality of the design and construction of the transition section is validated.
机译:路基和涵洞具有刚度和沉降的差异,这通常会导致刚度和几何的不规则性。本文主要针对京沪高速铁路廊坊段的CRTS II禁区轨道,并提高了转型控制技术剖面结构,包括填料的要求,施工设备的选择,轧制控制和质量指标控制。控制路基和涵洞之间过渡部分的不规则性,以满足高速列车安全,舒适,不间断的服务需求;采用两个过渡部分路基和涵洞的定居点特征,验证了过渡部分的设计和构造的合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号