首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Analysis of Influence of Shield Tunneling Crossing underneath Intercity Railway and Shield Tunneling Parameters Optimization
【24h】

Analysis of Influence of Shield Tunneling Crossing underneath Intercity Railway and Shield Tunneling Parameters Optimization

机译:城际铁路盾构穿越影响分析及盾构参数优化

获取原文

摘要

In the construction process of shield tunneling crossing underneath a intercity railway, it is inevitable to bring a potential safety hazard to the safe operation of the railway. Determing how to evaluate the influence of shield tunneling crossing underneath the railway and how to reduce the influence level are urgent to be solved. Taking a Wuxi subway project cross beneath the intercity railway for example, through numerical simulation and on-site monitoring, the influence level and the best construction parameters for the shield construction have been obtained. Under the action of the most unfavorable load, the settlement of the railway was only 1.9mm after shield tunnel cross through it. Through theoretical analysis and on-site dynamic monitoring methods, it optimized the configuration of shield construction parameters. Adopting the suggested methods, the shield tunnel has crossed through the railway successfully and the results show that the settlement control is perfect.
机译:在城际铁路盾构穿越施工过程中,不可避免地会给铁路的安全运营带来安全隐患。确定如何评估盾构穿越对铁路的影响,以及如何降低影响水平是迫切需要解决的问题。以无锡地铁跨城际铁路工程为例,通过数值模拟和现场监测,得出盾构施工的影响程度和最佳施工参数。在最不利荷载作用下,盾构隧道穿越后,铁路沉降仅为1.9mm。通过理论分析和现场动态监测方法,优化了盾构施工参数的配置。采用建议的方法,盾构隧道成功穿越铁路,结果表明,沉降控制是完善的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号