首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Study on the mechanical behavior of excavation and support construction of shallow tunnel
【24h】

Study on the mechanical behavior of excavation and support construction of shallow tunnel

机译:浅埋隧道挖掘力学行为及支撑施工的研究

获取原文

摘要

In this paper, the mechanical behavior of excavation and support construction of Weishe tunnel, which is a section of the Yangwu expressway, is studied quantitatively using 3D finite difference numerical simulation method. A sequential excavation method is used and the results show that the vault settlement occurs mainly on the phase of upper bench excavation. The convergences of upper and lower sidewalls occur mainly on the phase of lower bench excavation. During the construction, the surrounding rock pressure in the vault and sidewall of the tunnel decrease. Axial force of anchor reaches the maximum value after the finish of second lining. However, the surrounding rock pressure and internal force of steel arch reach the maximum value after completing the upper bench excavation, and then become as smaller as half of the peak value during the lower bench excavation.
机译:本文通过3D有限差分数值模拟方法,研究了Weishe隧道的挖掘和支撑结构的机械特性,即阳武高速公路的一部分。 使用顺序挖掘方法,结果表明,拱顶沉降主要发生在上层挖掘的阶段。 上侧壁的收敛主要在较低的台阶挖掘的阶段发生。 在施工过程中,隧道拱顶和侧壁的周围岩石压力降低。 锚杆的轴向力达到第二份衬里饰面后的最大值。 然而,在完成上台挖掘后,钢拱的周围岩石压力和内部力达到最大值,然后在较低的板凳挖掘过程中变得更小于峰值的一半。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号