首页> 外文会议>CEAM 2012 >Study on Artificial Regulation of Water Resources in West of Daqing City
【24h】

Study on Artificial Regulation of Water Resources in West of Daqing City

机译:大庆市西部水资源人工调节研究

获取原文
获取外文期刊封面目录资料

摘要

Since the development and construction of Daqing City, groundwater resource has been their main water supply source. However, over-exploitation of the groundwater is causing a series of environmental and geological problems. Thus it is essential to ensure sustainable development of groundwater and control the worsening of groundwater related environmental problems in the City. Practical scenarios of groundwater recovery based on several different water resources artificial regulation scenarios are designed to reduce exploitation after the completion of water diversion from Nen River Expansion Project. These scenarios include three different exploitation reducing scenarios and scenarios of artificial recharge based on reducing exploitation. The simulation results of Visual Modflow indicate that both reducing exploitation and artificial recharge based on reducing exploitation can accelerate the recovery of groundwater table in the confined aquifer. Considering the speed of the recovery of groundwater and the impact of reducing exploitation on domestic, industrial and agricultural utilization of water resources, artificial recharge based on reducing exploitation Scenario B is better. Under this condition, the groundwater table of the confined aquifer in the center of depression cone will be recovered by 5 to 8 m up to the end of 2020.
机译:自从大庆市的开发和建设以来,地下水资源一直是他们的主要供水源。然而,地下水的过度开采导致了一系列的环境和地质问题。因此,必须确保地下水的可持续发展并控制城市地下水相关环境问题的恶化。基于几种不同水资源人工规则情景的地下水回收的实践情景旨在减少NEN River扩建项目的进水后延期剥削。这些情景包括三种不同的开发减少方案和人工充电的情景,基于减少剥削。视觉模型的仿真结果表明,基于减少剥削的降低开发和人工补给可以加速受限含水层中地下水表的回收。考虑到地下水回收的速度和减少水资源利用剥削的影响,基于减少开发场景B的人工补给更好。在这种情况下,抑郁锥中心的受限含水层的地下水表将在2020年底恢复5至8米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号