首页> 外文会议>International Conference on Energy and Environmental Protection >Study on Temperature and Stress Development of Channel Lining Concrete in Construction
【24h】

Study on Temperature and Stress Development of Channel Lining Concrete in Construction

机译:施工渠道衬砌混凝土温度与应力发展研究

获取原文

摘要

Lining of water transportation channel needs high requirements of crack prevention. The tension stress which results from temperature and other factors during construction is an important reason that causes concrete cracks. Through the simulation of concrete lining during construction period with a section of the middle route of South-to-North Water Transfer Project, it is found that concrete pouring temperature, joint space, cutting joint time always make great contributions to lining crack. Based on calculation results some pertinence measures for temperature control and crack prevention are put forward. Engineering practice shows that effects of these measures are remarkable, which means these measures have significant reference to the concrete lining construction of the same type channels.
机译:水运渠道的衬砌需要耐火的高要求。施工过程中温度和其他因素产生的张力应力是导致混凝土裂缝的重要原因。通过施工期间混凝土衬里的仿真,南水北水转移项目中途的一段,发现混凝土浇注温度,联合空间,切割时间始终为衬砌裂缝做出很大贡献。基于计算结果,提出了一些温度控制和裂纹防范的措施。工程实践表明,这些措施对这些措施的影响显着,这意味着这些措施对相同型渠道的混凝土衬里结构具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号