首页> 外文会议>International Conference on Energy and Environmental Protection >Deformation characteristics of a preexisting landslide in reservoir area during reservoir filling and operation
【24h】

Deformation characteristics of a preexisting landslide in reservoir area during reservoir filling and operation

机译:储层灌装和运行过程中储层区域预先存在的滑坡变形特征

获取原文

摘要

A monitoring system was implemented to monitor the hydrodynamic and deformation response of a preexisting landslide in the Three Gorges Reservoir area. The monitoring results indicate that the deformation is mainly caused by reservoir impounding and is mainly composed of the deformation of the slip band. The effect of reservoir level fluctuation on landslide stability mainly depend on two aspects, one is the change of shear stress and shear strength on the slip surface due to the change of slide body weight and pore water pressure, the other is seepage pressure.
机译:实施监测系统以监测三峡库区预先存在的滑坡的流体动力学和变形响应。监测结果表明,变形主要由储存器蓄积引起,主要由滑槽的变形组成。储层水平波动对滑坡稳定性的影响主要取决于两个方面,是由于滑动体重的变化和孔隙水压的变化,剪切应力和剪切强度的变化,另一个是渗流压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号