首页> 外文会议>International Conference on Remote Sensing, Environment and Transportation Engineering >The Research on Removal Efficiency of Pollutants in Xinxue River Constructed Wetland
【24h】

The Research on Removal Efficiency of Pollutants in Xinxue River Constructed Wetland

机译:新夏河污染物污染物污染物湿地建造湿地的研究

获取原文

摘要

Based on the monitoring data of June 2009 from Xinxue River Constructed Wetland, Shandong, China, the research was done to reveal the variations of COD、 NH_3-N、 TN and TP in multistage series constructed wetland system. The results showed that the constructed wetland had a fairly good purification efficiency to the polluted water of Xinxue River, and the concentration of various pollutants gradually decreased along the technological process; the removal rate of COD、 NH_3-N、 TN、 TP was respectively 55.1%, 47.2%, 83.7% and 56.3%; in the retention pond and various stage of wetland, the removal rate of various pollutants was respectively 4.2~ 13.8% for COD, 2.5~13.0% for NH_3-N, 0.1~ 29.5% for TN and -25.0~ 25.0% for TP; because of the matrix releasing phosphorus to water, the effluent TP concentration of the fifth stage wetland is higher than the fourth stage.
机译:基于2009年6月的监测数据来自新秀河建造的湿地,中国山东山东,研究了揭示了多级系列构造湿地系统中COD,NH_3-N,TN和TP的变化。结果表明,建造的湿地对新秀河流的污染水有相当良好的净化效率,各种污染物的浓度沿着技术过程逐渐下降; COD,NH_3-N,TN,TP的去除率分别为55.1%,47.2%,83.7%和56.3%;在保留池和各个阶段的湿地时,各种污染物的去除率分别为4.2〜13.8%,NH_3-N为2.5〜13.0%,TN的0.1〜29.5%,TP的-25.0〜25.0%;由于基质释放磷,第五阶段湿地的流出物TP浓度高于第四阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号