【24h】

Surrounding Rock Stress Analysis of Sequential Mining Method

机译:序贯采矿方法周围岩石应力分析

获取原文

摘要

The surrounding rock stress field monitoring of sequential mining method has done and the field monitoring data has been compared with numerical simulation results. The result shows: Surround rock stress changes violently when the distance from monitoring section to the lower bench is less than a tunnel diameter, when the distance is more than a tunnel diameter, the surround rock presents rheological properties and stress changes smoothly and continuously. The construction of invert and side wall can effect the change trend of surround rock stress. Secondary lining receives the contact pressure created by rheological rock. The rheological stress release rate is less than 7% in rock arch and more than 55% in spandrel and hance.
机译:顺序采矿方法的周围岩石应力场监测已完成,并将现场监测数据与数值模拟结果进行比较。结果表明:当从监测部分到下凳的距离小于隧道直径时,环绕岩石应力剧烈变化,当距离大于隧道直径时,环绕岩石呈现流变性能,压力平稳,连续变化。逆变和侧壁的构造可以实现环绕岩压力的变化趋势。二次衬里接收流变岩产生的接触压力。流变应激释放速率在岩拱中小于7%,在施工和HANCE中超过55%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号