Stabilization of Deep Slope Failure with Drilled Shafts Lake Ridge Parkway Station 248 Grand Prairie, TX

机译:钻井楼山地湖山地山地山地山地稳定失效248大草原,德克萨斯州

获取原文

摘要

Lake Ridge Parkway was constructed in the early 1980s with earth fill embankments to raise the roadway grade above the reservoir level of the newly constructed Joe Pool Lake in southern Dallas and Tarrant counties, Texas. The embankments were constructed of residual Fat Clays of the Eagle Ford geologic formation, which were the only locally available soils. Over the ensuing years the embankments began experiencing shallow slope failures which began impacting the roadway pavements by about 2002. The shallow failures were investigated and subsequently repaired with Fiber-Reinforced Soil (FRS) in two phases completed in 2004 and 2007, respectively. During construction of the shallow slope failure repairs a much deeper slope failure was discovered in the vicinity of Station 248. Subsequent deeper site exploration detected a slow moving "creep" type failure mass sliding along a very soft bentonite seam within the underlying shale. The slide was repaired with 0.9-m (36-inch) diameter drilled shafts. The required capacity and spacing of the drilled shafts were determined with limit equilibrium methods and the shear, moment, and deflection of the shafts were determined using the "p-y" design approach for laterally-loaded drilled shafts. Construction of the deep slope failure repairs was completed in early 2010. The site history, exploration methods, design methodology, and construction activities are presented for the deep slope failure repairs.
机译:岭山湖港口建于20世纪80年代初,填补堤防堤防,以提高新建的乔伊池湖的水库水库等级达拉斯和塔克萨斯州塔斯塔斯县的水库等级。堤防是由鹰福特地质形成的残余脂肪粘土构成,这是唯一的局部土壤。在随后的岁月中,堤防开始经历浅层斜坡故障,该失败开始于2002年将道路划线的影响造成影响。在2004年和2007年完成的两个阶段进行了浅层故障,随后用纤维增强土壤(FRS)进行修复。在浅层斜坡衰竭的施工过程中,在站248附近进行了更深的斜坡故障。随后的深层现场探索检测到沿着底层页岩内的非常软的膨润土缝,检测到缓慢移动的“蠕变”型失效量。用0.9-m(36英寸)直径的钻井轴修理载玻片。利用限制平衡方法和轴的剪切,时刻和横向测定钻井轴的所需容量和间隔。使用横向装载的钻井轴的“P-Y”设计方法来确定轴的剪切,时刻和偏转。深度坡损失修理的建设于2010年初完成。介绍了山坡衰竭维修的网站历史,勘探方法,设计方法和施工活动。

著录项

  • 来源
    《Geo-Frontiers》|2011年||共10页
  • 会议地点
  • 作者

    Garry H. Gregory;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TB94-53;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号