首页> 外文会议>Asia-Pacific symposium on engineering blasting >Research and Practice of New Technique for Blasting Demolition of Hyperbolic Cooling Tower
【24h】

Research and Practice of New Technique for Blasting Demolition of Hyperbolic Cooling Tower

机译:双曲线冷却塔爆破拆除新技术的研究与实践

获取原文

摘要

The hyperbolic cooling tower is tall and big with thin wall and small depth-width ratio.In the traditional blasting demolition,drilling and blasting are needed on herringbone column,ring beam and tower shell simultaneously which result in large quantity of drilling and charges,protection of high difficulty,wide range of flying rocks,recoiling and squatting without collapse occasionally.For the above problems,a new technique is proposed for the cooling tower blasting demolition.First,several longitudinal cuts are made on the shell of the cooling tower in the collapse direction which will accelerate the transverse deformation during the collapse process.Second,node blasting is conducted to both ends of the herringbone column.Then the upper structure will collapse to the giving direction by gravity.The proposed technique is successfully applied in the blasting demolition of three 90m high hyperbolic cooling tower of Huarun Electric (Jinzhou) Co.,Ltd.Practice results show,compare to the traditional technique the proposed technique has shorter construction time,smaller collapse vibration,less cost,better safety,reduce the diffusion range of flying rocks and has a guiding significance for the construction of similar projects.
机译:双曲线冷却塔高大,薄壁较大,深度宽度比。在传统的爆破拆除,人字形柱,环形梁和塔壳上需要钻孔和爆破,同时导致大量的钻孔和收费,保护高难度,广泛的飞行岩石,重塑和蹲便而偶尔没有折叠。对于上述问题,提出了一种用于冷却塔爆破拆除的新技术。首先,在冷却塔的壳体上制造了几个纵向切口崩溃方向将加速折叠过程中的横向变形。第二个,节点爆破在人字形柱的两端进行。然后上部结构将通过重力塌陷。建议的技术在爆破拆除中成功应用于爆破拆除Huarun Electric(锦州)有限公司的三个90米高双曲线冷却塔.Practice结果表明,与TR相比附加技术所提出的技术具有较短的施工时间,折叠振动,成本较小,安全更好,减少了飞行岩石的扩散范围,对类似项目的构建具有指导意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号