【24h】

The Problems with PMLs

机译:PMLS的问题

获取原文

摘要

Probable Maximum Loss (PML), Scenario Expected Loss (SEL), and Scenario Upper Loss (SUL) earthquake damage estimates are being indiscriminately developed, used, and abused by the engineering profession and by the parties who commission and utilize PMLs. Owners may pressure engineers to obtain specific PML, SEL, and SUL values that they desire to meet insurance or lending requirements, and engineers often capitulate. Engineers use “black box” software and obtain either the desired values or values that are not representative of the actual structure. Black box software, which can “produce” PMLs at a small fraction of the cost required to actually understand the seismic behavior of the structure, has lowered the bar. Engineers who do not provide the desired values at a very low price tend to get cut out of the process. Meanwhile, the insurance companies and lending institutions, as third parties, blindly rely on the PML, SEL, and SUL values obtained by building owners to set insurance rates for the buildings in question or as the basis for deciding whether to issue financing -- setting up a clear conflict of interest on the part of the owners and the engineers. In some cases, building owners even appear to be using the PML, SEL, and SUL values to determine the policy limits for the property casualty insurance that they purchase, never realizing that the values are not appropriate for such a decision for an individual building. The authors examine the multitude of problems inherent in the PML, SEL, and SUL procedures being used by most of the profession, provide case studies, propose a more logical way of determining PML values, and present limitations and caveats for owners and other interested parties.
机译:可能的最大损失(PML),方案预期损失(SEL),以及方案上损失(SUL)地震损伤估计是由工程专业和委员会委托和利用PMLS的缔约方开发的,使用和滥用。业主可以压力工程师获得特定的PML,SEL和SUL值,他们希望满足保险或贷款要求,而工程师经常投产。工程师使用“黑匣子”软件,获取不代表实际结构的所需值或值。黑匣子软件可以在实际了解结构的地震行为所需的一小部分中,可以“生产”PMLS,从而降低了杆。没有以非常低的价格提供所需值的工程师往往会被切除出来。同时,保险公司和贷款机构作为第三方盲目地依赖于通过建立业主获得的PML,SEL和SUL值,以便为有关建筑物的建筑物或决定是否发布融资的基础 - 设定在业主和工程师的一部分中明确利益冲突。在某些情况下,建筑业主甚至似乎正在使用PML,SEL和SUL值,以确定他们购买的物业伤亡保险的政策限制,从未意识到这些价值观不适合个人建筑的决定。作者审查了大多数职业所使用的PML,SEL和SUL程序中固有的多种问题,提供案例研究,提出了一种确定PML值的更合理方式,以及所有者和其他有关方面的限制和警告。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号