This paper provides an update to the 2015 paper titled "A New Energy Storage Substation for the Portland to Milwaukie Light Rail (PMLR) Extension " [4] presented at the 2015 JRC in San Jose. The energy storage substation (ESS) with super-capacitor technology manufactured by Siemens was installed in place of a utility-connected substation at the Tacoma substation location to capture the energy generated by braking light rail vehicles and store it in the ESS energy savings mode and feed it back to the traction power supply during vehicle acceleration. In voltage stabilization mode, the ESS will enable the rail system to maintain voltage system stability by ensuring the system voltage to remain within the required voltage ranges and prevent system disruptions due to low system voltage conditions. In the Fall 2015, the Tacoma ESS went into service as part of the PMLR Orange Line light rail extension. This paper presents the design concepts for the unit, briefly discusses installation and testing, and focuses on the optimization process, operating experience, energy savings and reliability. TriMet operates a fleet of 145 light rail vehicles on its 60 mile network. Approximately 75% of the energy regenerated during braking is captured and re-used, saving an estimated $1.8 M annually in energy cost. The Tacoma ESS capacity is approximately 2.5 kWh. The unit normally operates in energy savings mode, maximizing recovery and re-use of braking energy while the secondary voltage stabilization mode is available to maintain system operation during outage conditions. After more than two years of revenue service operation, detailed operating data is presented and analyzed, including reliability information and actual energy and cost savings.
机译:本文为2015年JRC在圣何塞举办的2015年题为“波特兰新能源储存变电站的新能源储存变电站(Plyrkie Light Rail(PMLR)延期的新能源储存变电站(PMLR)延期”[4]提供了更新。安装了由Siemens制造的超级电容器技术的能量存储变电站(ESS)安装在塔科马变电区位置,以捕获制动轻轨车辆产生的能量,并将其存放在ESS节能模式中在车辆加速期间将其送回牵引电源。在电压稳定模式下,ESS将使轨道系统能够通过确保系统电压保持在所需电压范围内的系统电压并防止由于低系统电压条件来防止系统中断的电压系统稳定性。在2015年秋季,Tacoma ESS作为PMLR橙色线路轻轨扩展的一部分进行了服务。本文介绍了本机的设计概念,简要讨论安装和测试,专注于优化过程,操作经验,节能和可靠性。 Trimet在其60英里的网络上运营145辆轻轨车辆的车队。捕获并重新使用制动期间再生的大约75%的能量,每年节省估计的1.8米以能源成本。 Tacoma ESS容量约为2.5千瓦时。该装置通常以节能模式操作,最大化恢复和制动能量的重复使用,而次级电压稳定模式可用于在中断条件下保持系统操作。经过两年多的收入服务运行,提供详细的操作数据并分析,包括可靠性信息和实际能源和成本节约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号