Pre-construction HVAC Interference Predictive Modeling, Mitigation Installation and Follow up Testing on a 130 mile long 345 kV Transmission Line/Crude Pipeline Collocation

机译:预施高速HVAC干扰预测建模,减缓安装和跟进130英里长345 kV输电线/原油管道搭配

获取原文

摘要

This paper presents data and analysis from a case history involving the mitigation of AC interference on multiple crude pipelines in a 130mile (210 km) long collocation with a new 345 kV High Voltage Alternating Current (HVAC) power transmission line. The configuration was significantly more complicated than the stated capacity of the predictive modeling software used. However, with some compromises, predictive modeling using the software provided useful results and allowed for the design of a successful mitigation system. Actual field data is compared to predicted AC interference levels and the mitigation system details and operating characteristics are presented.
机译:本文介绍了涉及在130英里(210公里)的多个原油管道上减轻交流干扰的案例历史的数据和分析,使用新的345kV高压交流电流(HVAC)电力传输线。该配置比使用的预测建模软件的规定容量显着复杂。然而,随着一些妥协,使用该软件的预测建模提供了有用的结果并允许设计成功的缓解系统。将实际的现场数据进行比较,以预测的AC干扰电平,并且提出了缓解系统细节和操作特性。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号