首页> 外文会议>Iron steel technology conference >ArcelorMittal Dofasco #2 Blast Furnace Stove Repairs
【24h】

ArcelorMittal Dofasco #2 Blast Furnace Stove Repairs

机译:arcelormittal dofasco#2高炉炉炉维修

获取原文

摘要

1. Process data did not show any anomalies or long term deterioration of the stove until it was too late. High temperature visual inspections seem to be the only means to validate the condition of the stoves. 2. A cross functional team approach between the ArcelorMittal Dofasco, the refractory supplier and contractors proved to be an excellent team effort. 3. The monolithic construction enabled us to build a Stove without the many special brick shapes traditionally used for a Stove. The monolithic partition wall has proven to be much more gas tight compared to the traditional brick wall. 4. When a catastrophic stove failure took place innovative techniques and solutions effectively overcame traditional brick delivery issues.
机译:1.过程数据没有显示出炉子的任何异常或长期恶化,直到为时已晚。高温视觉检查似乎是验证炉子状况的唯一手段。 2. ArcelorMittal Dofasco之间的跨职能团队方法,耐火材料供应商和承包商被证明是一个优秀的团队努力。整体施工使我们能够在没有传统上用于炉子的许多特殊砖形状的情况下建造炉子。与传统的砖墙相比,整体式隔墙已经被证明是更紧密的气体。 4.当灾难性的炉灶失败发生创新的技术和解决方案时,有效地克服了传统的砖交付问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号