首页> 外文会议>International Conference on E-Product E-Service and E-Entertainment >Mining Production Scale Optimization of Metal Mines Due to Transformation from Deep Open-Pit to Underground Mining
【24h】

Mining Production Scale Optimization of Metal Mines Due to Transformation from Deep Open-Pit to Underground Mining

机译:采矿生产规模优化金属矿山因地下矿井的转化

获取原文

摘要

Rationally determining the scale of production is one of the key technical problems of the mining from open-pit to underground. In this paper, technical, economic and social factors on the production scale of Daye Iron Mine are considered comprehensively, and the theory and method of fuzzy comprehensive evaluation are used to select. Then, verified by the gray system theory, the optimal scale of production after from open-pit to underground mining is obtained, which provides an advantaged theoretical basis for decision-making and design of the mine.
机译:理性地确定生产规模是从露天坑到地下采矿的关键技术问题之一。在本文中,全面考虑了大冶铁矿生产规模的技术,经济和社会因素,使用模糊综合评估理论和方法选择。然后,通过灰色系统理论验证,获得了从露天挖掘到地下采矿后的最佳生产规模,为矿井的决策和设计提供了优势理论依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号