There is big difference in the foundation size selection of the concrete arch dam considering the upstream reservoir water load, so the 3-D FEM is constructed with the typical high arch dam in 300 m class in this paper, to analyze the displacement and stress under the condition that foundation depth and left and right banks foundation size are fixed, with the upstream and downstream foundation size changing, and the condition that the foundation depth, left and right banks and upstream and downstream foundation size take the same value and increased correspondingly. Analysis shows that: (1) when the water pressure only loads on the dam, the stress and displacement tend to be stable with the increase of the foundation size. (2) considering the upstream reservoir basin water load, the stress tends to be stable with the foundation size increasing, the displacement tends to be stable with the increase of the upstream and downstream foundation size under the condition of the foundation depth and left and right banks foundation size are fixed, while the displacement can't tend to be stable under the condition of the foundation depth, left and right banks and upstream and downstream foundation size take the same value and increase correspondingly. (3) the actual foundation size is limited, if the foundation depth and left and right banks foundation size are fixed and taking the same value and no more than 40 times of the dam height, the displacement and stress of the dam has been able to meet the engineering precision or achieve stability when the upstream and downstream foundation size select 5 - 10 times of the dam height.
机译:考虑上游储层水负荷的混凝土拱坝的基础尺寸选择有很大的差异,所以3-D有限元在本文中用典型的高拱坝构建,分析了位移和压力基础深度和左右银行基础尺寸的条件是固定的,上游和下游基础尺寸变化,以及基础深度,左侧和右岸和上游和下游基础大小的条件采取相同的价值,相应地增加。分析表明:(1)当水压仅在大坝上载荷时,随着基础尺寸的增加,应力和位移往往是稳定的。 (2)考虑到上游水库盆地水负荷,应力随着基础尺寸的增加而稳定,随着基础深度和左右的情况下,位移随着上游和下游地基规模的增加而趋于稳定银行基础规模是固定的,而在基础深度的条件下,位移不能稳定,左手和右岸和上游和下游基础大小采取相同的价值并相应增加。 (3)实际基础尺寸有限,如果基础深度和左右和右岸基础尺寸固定并采取相同的价值,不超过50倍的大坝高度,则大坝的位移和压力已经能够当上游和下游基础尺寸选择5 - 10倍的坝高时,满足工程精度或实现稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号